American Standard Green Tea Deck-Mount Bath Filler 7010.900 Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Articles sanitaires American Standard Green Tea Deck-Mount Bath Filler 7010.900. American Standard Green Tea Deck-Mount Bath Filler 7010.900 User's Manual [en] Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 4
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
*Wrench
Certified to comply with ANSI A112.18.1M
Recommended Tools
*Supplied with Fitting
*Hex key
SPOUT RECESS
Turn off hot and cold water
supplies before beginning.
CAUTION
1
2
Assemble RUBBER WASHER (4) and BRASS WASHER (5) and
LOCKNUT (6) onto SPOUT SHANK (3). Align SPOUT ASSEMBLY
and from underside of ledge secure SPOUT ASSEMBLY into
position with LOCKNUT (6).
SPOUT ASSEMBLY
PREPARE TUBE AND TEE ASSEMBLY
4
2
3
1
3
4
1
2
4
5
Prepare TUBE and TEE ASSEMBLY (1) to fit center to center
VALVE (2) location (between 6-1/2" and 12"). If necessary,
cut and/or bend TUBING carefully. Make sure tube bend is
close to the TEE (1) so that it will not effect the compression
joint at the VALVE CONNECTION.
ADJ. 6-1/2 TO 12
6
5
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
MOUNTING
SURFACE
VALVE inlet is 3/4-inch NPT male.
NOTE
MOUNTING
SURFACE
ADJ. 6-1/2 TO 12
ROUGHING-IN DIMENSIONS
MOUNTING
SURFACE
8-1/16"
DECK-MOUNT BATH FILLER
Installation
Instructions
7010.900
7010.901
1-1/2 MAX.
1-1/4
MAX.
1-3/16 DIA.
3
(H)
(C)
1-1/8 DIA.
12 MAX
2-1/16
DIA.
1-1/16 DIA.
3/4-14 MALE
N.P.T. INLETS
Install RING WASHER (1) into SPOUT recess. Check that O-RING (2)
on end of SPOUT SHANK (3) is in place. Insert SPOUT SHANK (3)
through center hole on mounting surface.
GREEN TEA
5-5/16"
3"
3-3/4"
10-5/8"
2-1/16"
DIA.
2-1/8"
3
M968595 Rev.1.2
2-9/16"
Remove COUPLING NUT (3) and FERRULE (4) from each
VALVE (2) and slide onto TUBING (5).
SPOUT
ASSEMBLY
Thank you for selecting American-Standard...the benchmark
of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please
read these instructions carefully before you begin.
7-7/8"
(200mm)
Vue de la page 0
1 2 3 4

Résumé du contenu

Page 1 - Instructions

*WrenchCertified to comply with ANSI A112.18.1MRecommended Tools*Supplied with Fitting*Hex keySPOUT RECESSTurn off hot and cold watersupplies before be

Page 2

5SERVICE245/16'' MIN.MOUNTINGSURFACEFOR FITTINGLESS SPRAY111110134Push TUBING (3) ends into VALVE (4) side outlets. Insert VALVES (4)into mo

Page 3 - VIEW "A"

HANDSHOWER INSTALLATION (FOR MODEL 7010.901 ONLY) Drop SPRAY ESCUTCHEON (1) through the fourth hole of the tub ledge (12" max from SPOUTcenter) w

Page 4 - GREEN TEA

028679-0070ATUBE & TEEASSEMBLY012668-0070ASHANK KIT030274-0070ASHANKMOUNTING KITM911810-0070ARUBBER RING012078-0070AVALVE COUPLING KITM962616-YYY

Commentaires sur ces manuels

Pas de commentaire