Installation InstructionsInstallation InstructionsCertified to comply with ASME A112.19.2© 2014 AS America, Inc.Exposed Flushometerfor 1-1/2" Top
5. Spud Flange 6. Wall Escutcheon7. Cover Tube8. Sweat Adapter9. Stop Valve1. Installation Instructions2. Flush Valve Body Assembly3. Vacuum Breaker T
RECOMMENDED TOOLS; Fig. 2Fig. 21.2.3.4.5.6.7.8.9.10.Teflon Tape Flat Blade ScrewdriverAdjustable Wrench Tape Measure HacksawTubing CutterFileFor Swe
3M965646 REV. 1.2 (4/15)12345Fig. 51-1/2" TOP SPUD11423Fig. 41. Measure from finished wall to first thread of Adapter or threaded supply pip
4M965646 REV. 1.2 (4/15)3. Pull the VACUUM BREAKER TUBE (7) up to meet thethreaded FLUSH VALVE BODY (5), hand tighten the VACUUM BREAKER COUPLING NUT
5M965646 REV. 1.2 (4/15)1Fig. 92REMOVE COVERCLOCKWISE CLOSESSTOP VALVECOUNTER-CLOCKWISEOPENS STOP VALVEIMPORTANT: To avoid overflowing, the STOP VALVE
6M965646 REV. 1.2 (4/15)3348 REPLACE BATTERY; Fig. 11, 11a3C1. Loosen SET SCREW (1) with 2.5mm Hex Wrench (2) in back of FLUSH VALVE COVER (3). F
7M965646 REV. 1.2 (4/15)111" - 2" (30mm - 50mmBLINKING LEDBLINKING LEDFig. 14DETECTION ZONE400mm TO 800mm(Factory Setting: 400mm) SET DE
8M965646 REV. 1.2 (4/15)TROUBLESHOOTING FLOW CHARTSNNOO YYEESS NNOO YYEESS NNOO 11 22 11 22YYEESS NNOO YYEESS NNOO UNIT DOES NOT FUNCTION
Commentaires sur ces manuels